Does Creswell require a permit for landscaping?expand_more
Work in City right-of-way requires a Creswell construction permit; confirm the property boundary and exact scope with the City.
Why inspect drainage first?expand_more
Grades, roof discharge, soil, and irrigation affect plant health, hardscape stability, and water movement near structures.
Who should locate utilities?expand_more
Use the public utility notification process and assign private-line locating for irrigation, septic, lighting, and other owner systems.
What belongs in a plant schedule?expand_more
List botanical name, quantity, installed size, location, spacing, soil preparation, mulch, watering, and substitution approval.
How should irrigation be accepted?expand_more
Operate every zone, inspect leaks and coverage, verify controls, and record valve and component locations.
What makes hardscape proposals comparable?expand_more
Align excavation, base, drainage, reinforcement, surface, joints, transitions, and restoration.
How should plant replacement be handled?expand_more
Write establishment care, inspection timing, exclusions, and replacement responsibility into the agreement.
What records belong at closeout?expand_more
Keep permits, irrigation maps, controller instructions, plant schedules, care guidance, warranties, and final photographs.