Survey drainage, elevation and access: what should a Cottage Grove homeowner confirm?expand_more
Measure slopes, thresholds, downspouts, soil contact, existing settlement and water paths. Record equipment access, overhead limits, landscaping, utilities and concrete-removal routes. Put the agreed scope, responsible party and completion evidence in writing.
Define demolition and disposal limits: what should a Cottage Grove homeowner confirm?expand_more
Mark saw cuts, retained edges, adjacent foundations, reinforcement, buried services and surfaces requiring protection. State whether old material is removed, crushed for approved reuse or hauled away. Put the agreed scope, responsible party and completion evidence in writing.
Specify excavation and base preparation: what should a Cottage Grove homeowner confirm?expand_more
State excavation depth, unsuitable-material removal, geotextile or aggregate where designed, lift thickness, compaction method and verification. Soil and moisture conditions are property-specific, so avoid promising performance from a generic base description. Put the agreed scope, responsible party and completion evidence in writing.
Coordinate reinforcement and embedded items: what should a Cottage Grove homeowner confirm?expand_more
Show reinforcing type, spacing, support, laps and connection details required by the design. Locate sleeves, anchors, post bases, drains, conduits and other embeds before placement. Put the agreed scope, responsible party and completion evidence in writing.
Write the placement and finish standard: what should a Cottage Grove homeowner confirm?expand_more
Identify concrete or masonry product requirements, thickness, edges, finish texture, color expectations, control joints and weather limitations. For repaired work, set the visual match boundary and acknowledge existing weathering. Put the agreed scope, responsible party and completion evidence in writing.
Plan joints, curing and protection: what should a Cottage Grove homeowner confirm?expand_more
Locate control, isolation and construction joints based on the actual geometry and adjacent structures. State curing method, protection from traffic, weather and irrigation, and the owner's use restrictions. Put the agreed scope, responsible party and completion evidence in writing.
Confirm Cottage Grove review responsibility: what should a Cottage Grove homeowner confirm?expand_more
Cottage Grove publishes building, mechanical, electrical and plumbing application and inspection services through its Building Department and ePermitting. Confirm the actual address and scope. Put the agreed scope, responsible party and completion evidence in writing.
Verify performance and closeout: what should a Cottage Grove homeowner confirm?expand_more
Check dimensions, elevation, drainage, finish consistency, edges, joints, embedded items, cleanup and adjacent restoration. Complete required inspections before final payment. Put the agreed scope, responsible party and completion evidence in writing.